
A special RM800,000 allocation is urgently needed to repair a bund at the flood mitigation project near Sungai Sama Gagah, Kerian, which was damaged following the floods that hit the area yesterday.
Kerian floods: RM800,000 allocation urgently needed to repair bund

Recent Posts
Hakim Danish keenam terpantas
September 18, 2026
Presiden Indonesia disaman rakyat kerana kebakaran hutan
September 18, 2026
Tiga maut dalam insiden tembakan di sekolah Filipina
September 18, 2026