Kerian floods: RM800,000 allocation urgently needed to repair bund

Kerian floods: RM800,000 allocation urgently needed to repair bund

Kerian floods: RM800,000 allocation urgently needed to repair bund
A special RM800,000 allocation is urgently needed to repair a bund at the flood mitigation project near Sungai Sama Gagah, Kerian, which was damaged following the floods that hit the area yesterday.

Scroll to Top